Finished

The Perez Driveway

Nothing sits on dirt.

A driveway is only as good as what is under it: the ground dug out, the base laid and compacted in lifts, and the surface set on that. This page follows the job stage by stage, from the old concrete to the finished edge.

Where
Cranston, RI
Scope
Driveway and front steps
Status
Complete
The before
What was there

Concrete slabs laid end to end, heaved and split along every joint, with grass growing up through the cracks and a strip of bare ground beside it where the cars actually parked.

The old driveway from the street: cracked concrete slabs with grass in the joints, bare ground beside it, the garage at the end

Before image © Google Street View.

The layout
Marked before anything is dug

The new line is sprayed on the ground before a shovel goes in: across the lawn beside the old driveway, and down to where it meets the street at the curb. Everything that follows is built to that line.

Orange marking paint across the lawn beside the driveway, showing the new edge
Marking paint running down to the curb where the driveway meets the street
The old curb cut and cracked apron at the street, marked for the new driveway
The worn strip of old concrete and grass along the side of the house
The tear-out
Down to firm ground

The old slabs and the cracked apron come up and leave on the trailer. Then the ground is dug out past the old base, cut to the lines and graded, so what goes back in is built on something that will not move.

The skid steer taking the old driveway out
The driveway dug out to graded subgrade between the fence and the house, string lines set
The skid steer and equipment trailer on site, the driveway dug out behind them
The base
Laid, wetted and compacted

Gravel brought in and compacted in lifts, then the bedding course screeded flat under the string lines. Every line on the finished surface is decided here: the pitch away from the house, the edge along the fence, the level at the garage door.

The finished base from the street, screeded flat up to the garage, string lines across the front
The base along the fence line, stakes and string marking the edge
The laying
Set from the house out

The pavers go down in a random pattern of mixed sizes, set tight from the house out. The plate compactor follows, seating each section into the bedding course.

Pavers going down across the base, the plate compactor and pallets in the foreground
Close on the laying edge, the next pavers standing ready on the field
The front steps
Granite, on laid stone

The poured stoop came out with the driveway, undercut where the ground had washed from beneath it. In its place: three granite treads, each a single piece with the rock face left on its edge, carried on courses of laid stone.

After — three granite treads with rock-faced edges on risers of laid stone, at the front door Before — the old poured concrete stoop, the ground washed out from under its bottom step BEFORE AFTER
⇄
← DRAG →
The same door, from the same place. A poured stoop with nothing left under its front edge, against granite on stone.
The granite steps from the side, the treads stepping down past the stone risers
The finish
Edged, sanded, done

A darker border course runs the whole perimeter and squares off at the street, so the field has a clean edge on every side. Joints sanded, the beds beside it topsoiled, and the drive runs from the curb to the garage door in one surface.

The finished paver driveway from the street, a dark border course around the field, the garage at the end
The finished driveway in full sun, looking toward the garage past the new granite steps
Along the finished border course toward the street, new topsoil beside it
The finished driveway from above, three cars parked on it between the fence and the house

Anyone can set the middle. The edge tells you who built it.